Pilot setup checklist
The preparation needed to bring one floor live in a single day: inventory, network, accounts, screens, rules and verification.
One week before
List the room inventory: name, floor, capacity, equipment.
Check the network points and power supply.
Confirm that room resources are defined on the calendar side.
Decide the admin and editor roles for the dashboard.
Morning of setup day
Mount the screens, switch them on and note the PINs.
Create the rooms in the dashboard; connect the screens with their PIN by choosing a type.
Connect the calendar account and complete the room mapping.
Afternoon of setup day
Set the check-in window and the automatic release rule.
Connect the corridor board to the floor entrance and arrange the room order.
Create the announcement playlist and publish the first content.
Verification
Create, update and cancel a test meeting.
Check in on the door screen, then wait for and watch the automatic cancellation.
Check the online status of the screens from the Devices list.
First week
Send users a short briefing: what can be done from the door screen?
Track the ghost booking rate; if the rule is too strict, widen the window.
Rollout criterion
Once the check-in rate on the pilot floor is stable and support requests have dropped, the same configuration is applied to the other floors as a template.